|
No.
|
Subject
|
|
|
General
|
|
1.
|
Knowledge and adherence
to ARTCC SOPs and policies is demonstrated.
|
|
2.
|
Correct frequencies used
per local SOP.
|
|
3.
|
Demonstrates
understanding of separation responsibilities (IFR, VFR).
|
|
4.
|
Demonstrates
understanding of airspace classification and procedures associated with each.
|
|
5.
|
Handoffs are initiated
on a timely basis.
|
|
6.
|
Pointouts are applied
properly and timely.
|
|
7.
|
Transgression of
airspace boundaries is avoided.
|
|
8.
|
Aircraft deviating from
SOP are coordinated with downstream controller if applicable.
|
|
9.
|
Aircraft are vectored in
accordance with MVAs. Demonstrates understanding of safe altitude information
(MVA, MEA, MSA, MOCA).
|
|
10.
|
Vectoring methods are
correct (rounded to nearest 10 degrees). Pilots are informed of reasons for
vectors off assigned routes. Vectors are only issued to a/c of
responsibility.
|
|
11.
|
Proper separation is
maintained between targets of responsibility.
|
|
12.
|
Traffic advisories are
issued properly and timely.
|
|
13.
|
Aircraft are informed of
special use airspace and vectored clear as required.
|
|
14.
|
Speed restrictions are
properly applied and phrased, meet with 7110.65 limitations, and are released
when appropriate. Restrictions are passed to downstream controller if needed.
|
|
15.
|
Aircraft declaring
emergencies are handled properly.
|
|
|
Departures
|
|
16.
|
IFR Releases and
clearance void times are correctly issued to aircraft at uncontrolled towers.
|
|
17.
|
Proper release
procedures are followed with subordinate Towers.
|
|
18.
|
Radar identity of
departing aircraft is established.
|
|
19.
|
Initial and subsequent
climb instructions are issued in accordance with local SOP and routing.
|
|
20.
|
PNAV SID departure
instructions are handled correctly.
|
|
21.
|
VECTOR SID departure
instructions are handled correctly.
|
|
|
Arrivals / Transitions
|
|
22.
|
Radar identity of pop-up
targets is established.
|
|
23.
|
Local altimeter settings
issued on contact.
|
|
24.
|
Landing weather
conditions furnished to aircraft if needed.
|
|
25.
|
Landing runway
assignment is determined per SOP and in concert with Tower Local Control and
passed to aircraft if required.
|
|
26.
|
Aircraft arriving off of
approved routings are re-routed in accordance with local SOP.
|
|
27.
|
Aircraft on vectored
arrivals are descended per local SOP and published procedures.
|
|
28.
|
Aircraft on profile
arrivals are cleared to descend per local SOP and published procedure.
|
|
29.
|
Aircraft are properly
transitioned from enroute to approach segments (PTAC).
|
|
30.
|
Demonstrates
understanding of precision approach procedures (ILS).
|
|
31.
|
Demonstrates
understanding of non-precision approach procedures (LOC, BC, VOR, GPS, NDB,
DME Arc).
|
|
32.
|
Proper handling of
missed approaches is performed.
|
|
33.
|
Appropriate and proper
use of holds is applied.
|